Logo.white.80.webp

  • Home
  • About
  • Services
    • Our Services
    • SPT Energy Calibration
    • CPT & DHS Services
  • Equipment
    • Track Mount Rigs
    • Truck Mount Rigs
    • Portable Drilling
    • Field Support Equipment
  • Past Projects
  • HSE
  • Careers
  • Contact & Locations

Highway 29 Realignment

Location Hudson Hope, B.C.
Date(s) 2016 - 2020 
Value ~$400 Million
Rig Type(s) 1-3 Track Rigs/Crane/UTV
Drill Method(s) Odex Air Rotary/HQ3 Rock Coring/HQ3 Soil Coring/Mud Rotary 
Sampling SPT/LPT/ CPT/ DCPT/ Shelby Tube/ Vane Sheer/Pitcher Barrel 

Westech spent 4 years from 2016 – 2020 providing geotechnical drilling services for BC Hydro’s Site C Project, specifically for the realignment of Hwy 29, which required a new 30 km long route and five new major bridges. A significant portion of this work had to be conducted on private property. Westech implemented full tarp and rig pad containment systems to ensure maximum protection of the environment and minimal disturbance of private property terrain. Work was conducted during both weather extremes that have become the norm in the Peace Region. Successfully completed this project through regular -30C cold snaps in the winter and +30C heat waves in the summer. 

2024 Canadian Consulting Engineering Award

1-1 Hyw 29  Pic 1 of 6.webp
1-1 Hyw 29  Pic 1 of 6 - Copy.webp
1-1 Hyw 29  Pic 1 of 6 - Copy (4).webp
1-1 Hyw 29  Pic 1 of 6 - Copy (3).webp
1-1 Hyw 29  Pic 1 of 6 - Copy (2).webp
1-1 Hyw 29  Pic 1 of 6 - Copy (2) - Copy.webp

Westech Drilling Corp.
13695 East Beaverley Road
Prince George, BC
V2N6L5

info@westechdrilling.com
250-964-8748

ABC Web Link Web DesignVayaCMSAdministration Area